We have been asked a number of times why Ridge Trail first. Our reasoning; it is the most traveled road in the association with the most conditions that we are trying to solve for (I.e., gradual hills with constant erosion, spillways, cliffs, narrowing of the road on the east end to 20’ wide to reduce speed, chronic pothole areas, lots of foot traffic, blind curves).
We will tackle one stretch of road per year and what we learn from Ridge Trail will help us determine the next stretch to be done. Hallack provided all of the engineering, grade, depth, quantity and build of the road, so you can be assured that this part was done by professionals. Hallack has been MDOT prequalified since 1995 to do this type of work.
Thanks for your patience.